PVC Schedule 40 conduit which as been heated and bent to effect a 45 degree change in direction in a conduit run. Can be used above ground or buried and are suitable for concrete encasement.
- Plain end connections are solvent weld
- Schedule 40 PVC construction for strength and durability
- Standard radius